TOFTE PRIVATE CONCRETE STORM WALL ON LAKE SUPERIOR
Concrete seawall design for shoreline erosion protection.
LOCATION
Tofte, Minnesota
SERVICES
Shoreline Stabilization
Topographic Surveying
Drone Surveying
Permitting & Regulatory Compliance
Concrete Storm Wall Design
Construction Documents
Cost Estimating
PARTNERS
Private Residential Owner
Nordic Group
AMI provided engineering design and permitting services for a shoreline stabilization project addressing erosion impacts along Lake Superior in Tofte, Minnesota.
AMI performed an initial site visit to determine the extents of the shoreline damage. A coastal engineer/certified drone pilot took photos of the existing shoreline and documented damage to the deck. A proposal was submitted to the Owner to perform the following services: topographic surveying, permitting, and engineering/drafting.
Following the topographic surveying, two preliminary design solutions with estimated construction costs were provided to the Owner to restore the land lost due to erosion and protect the land around the deck from future erosion. A concrete retaining wall anchored to the bedrock was selected as the proposed design option. AMI performed wave overtopping calculations using several references to determine the minimum wall height required to protect the property from climate change events over a minimum of 50 years. Permits were submitted to the county, MnDNR, and Army Corp. of Engineers. AMI provided the Owner with required documentation from the permitting agencies following the approved permits.
Once the construction drawings were completed, AMI provided estimated construction costs for the final design to compare with bids from local contractors. Nordic Group (AMI’s Sister Construction Company) was awarded this project with several very competitive bids received. AMI worked with the contractor to coordinate construction scheduling with the Owner. During construction, AMI performed special inspections during the installation of critical components of the design to document any adjustments or field engineering performed. Once the construction work was completed, AMI performed a final walk through with the Owner and Contractor to make sure all items were completed as discussed and if additional work was required.
BEFORE
AFTER
AFTER - wildflower vegetation, landscaping and stairs
AFTER